In short
To get contractor classification in Abu Dhabi, make sure your trade licence carries DMT approved activities, pick a category you qualify for (new companies usually start at Fifth or Sixth), add DMT licensed engineers to your cadre, prepare audited financials with the DMT template and auditor declaration, then apply on TAMM: firm record, criteria record, engineers and projects, and the Activity Practicing Licence. With a complete file it usually takes two to four weeks.
Every contracting company in Abu Dhabi whose trade licence includes classifiable activities needs a classification certificate from the Department of Municipalities and Transport (DMT) before it can practise those activities. The official name is the Activity Practicing Licence. Without it you cannot take new work or get new building permits. This guide walks through how to get it, in the order DMT expects. For the full category tables and rules, see our classification certificate guide.
Before you start: three things to check
- Your licence activities. Your trade licence must carry the specific DMT approved activities you want classified, such as building contracting, roads or MEP. An instant licence issued under general contracting needs those activities added first.
- Contractor or consultant. One firm is classified either as a contractor or as an engineering consultant, never both. Consultancy offices follow a different path, explained in our engineering consultant classification guide.
- Who will apply. A partner, owner, manager or authorised signatory named on the trade licence opens the firm account on TAMM with UAE PASS.
Step 1: choose the category you can reach now
Your category caps the value of a single project you can bid for. It depends on net equity in your audited accounts, ISO certification, licensed engineers and completed projects. A new company with no project history normally starts at Sixth or Fifth, because neither needs completed projects.
| Category | Engineers per activity | Completed projects needed | Maximum project value |
|---|---|---|---|
| Sixth | 1 engineer, 3 years experience | None | AED 7 million |
| Fifth | 1 engineer, 4 years experience | None | AED 10 million |
| Fourth | 1 engineer, 5 years experience | AED 15 million in the last 10 years | AED 30 million |
| Third | 2 engineers, 5 years each | AED 30 million in the last 10 years | AED 60 million |
Second, First and Special also need net equity of AED 5, 10 or 20 million and ISO 9001 and ISO 14001. The full tables are in our contractor categories guide, and when you outgrow your category, see how to upgrade.
Step 2: get your engineers licensed and on your cadre
Each engineer must hold a DMT engineer licence and be invited onto your firm’s cadre in the engineers licensing system. An engineer counts towards one activity only, so two activities at Sixth need two engineers. DMT reads experience from the engineer licence, so separate CV uploads are not part of the official file. Engineers joining from outside the firm need a job offer.
Step 3: prepare the financial file
This is where most applications stall. The criteria record needs:
- Certified audited financial statements for the last financial year
- The DMT financial data template, completed from the audited statements
- The auditor’s declaration on the DMT form, in Arabic, confirming the firm meets the financial conditions
- A copy of your accounting and auditing contract (for higher categories) or a declaration of an in-house accounting team
Since November 2025 an audited report is accepted for 18 months for classification purposes. If your company has not yet completed its first financial year, confirm with the municipality what it will accept before you submit.
Step 4: collect the remaining documents
- Valid Abu Dhabi trade licence (read electronically by TAMM)
- OSHAD registration, or an undertaking to register
- ISO 9001 and ISO 14001 certificates where your category needs them, or an undertaking to provide them
- Professional indemnity insurance where required, for example for surveying and design and build activities
- For categories that need project history: contracts, consultant approved bills of quantities by activity and completion or final payment certificates
The complete list, with what is not required, is in our DMT documents checklist.
Step 5: apply on TAMM
- Open the engineering firm account on TAMM with UAE PASS.
- Create the firm record. Choose contractor, local or branch, and your target category. This is instant.
- Submit the classification criteria record with the financial file, ISO, insurance and OSHAD details. The municipality (Abu Dhabi City, Al Ain or Al Dhafra) reviews it in about five working days.
- Add engineers and projects. Invite your engineers to the cadre and enter any projects from the last ten years. Each project is reviewed in about five working days.
- Apply for the Activity Practicing Licence. Select the activities and categories. Where no project review is needed, the licence is issued instantly.
How long it takes
| Stage | Typical time |
|---|---|
| Firm record | Instant |
| Criteria record review | About 5 working days |
| Each project review | About 5 working days |
| Licence issue | Instant to about 5 working days |
| Whole first classification, file ready | Usually 2 to 4 weeks |
Why applications get sent back
- The licence activity does not match the activity applied for.
- Audited statements missing, older than 18 months, or the DMT template and Arabic declaration not signed by the auditor.
- An engineer’s licence has not been issued or the engineer is already counted for another activity.
- Project evidence without a consultant approved BOQ or completion certificate.
After you are classified
The certificate is valid for two years. You can renew from 30 days before to 30 days after expiry; after that it is suspended, and it is cancelled 90 days after expiry. If an engineer leaves, you have 30 days to replace them before the activity is suspended. Plan your audit so a valid financial report is ready for every renewal or upgrade.
Frequently asked questions
Can a new company get contractor classification with no projects?
Yes. Sixth and Fifth need one DMT licensed engineer per activity and no completed projects, so they are the usual starting point for a new contracting company.
How long does contractor classification take in Abu Dhabi?
The firm record and licence issue are instant, and the municipality reviews the criteria record and each project in about five working days. With a complete file, a first classification usually takes two to four weeks.
Do I need audited financial statements?
Yes. The criteria record uses your audited statements for the last financial year, the DMT financial template and an Arabic auditor declaration. Net equity from the audit decides whether you can reach Second, First or Special.
Can I apply myself?
Yes. A partner, owner, manager or authorised signatory on the trade licence can apply on TAMM. Many firms use their auditor or a consultant to prepare the financial file and project evidence so the application is not returned.
Is Abu Dhabi classification valid in Dubai?
No. Each emirate classifies contractors under its own rules, so work in Dubai needs a separate registration with Dubai Municipality.